国产精品99久久久久久猫咪,亚洲国产精品一区二区制,亚洲 欧美 国产 日韩 字幕,亚洲男人的天堂色偷免费

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
黑人与人妻无码中字视频| 亚洲精品综合| 麻豆婷婷狠狠色18禁久久| 2020国产亚洲精品高清| 午夜福利诱惑在线免费看| 欧美综合日韩专区久久麻豆| H纯肉无码动漫在线观看| 欧美交换国产一区内射| 日韩亚洲一区二区三区在线| 精东影业传媒在线观看| 精品国产免费笫一区二区| 真实的国产乱xxxx在线| 欧美日韩国产图片区一区| 中文无码一区二区三区在线观看| 国产打屁股在线调教97| 国产传媒污视频在线观看| 播放久久国产乱子伦精品| 最新91福利导航在线观看| 久久精品国产99精品亚洲| 一区二区亚洲 av免费| 亚洲 欧美 国产 日韩 字幕| 无码熟熟妇丰满人妻啪啪| 成人无码www免费视频| 国产精品香蕉在线的人尹人| 亚洲欧美日韩不卡一区二区| 狠狠躁18三区二区一区| 久久久精品视频免费在线| 天天干天天操天天干天天| 国产精品美女久久久久av爽| 性高朝久久久久久久齐齐| 色悠悠综合在线资源网站| 丰满人妻妇伦又伦精品a| 亚洲性无码av中文字幕| av无码三级片在线播放| 亚洲精品综合| 久久99精品国产麻豆不卡| 无码一区二区波多野结衣播放搜索 | 精品中文字幕久久久人妻| 一区二区三区高清视频| 国产精品香蕉在线的人尹人| 久久精品久久久久久婷婷|